A modular GoodWe battery and hybrid inverter for three-phase homes.
Research-based opinionConfirmed Australian residential pageChecked 13 November 2026
5–96 kWh
01
Manufacturer-sourced facts
What it is.
These are product facts, not a score or endorsement.
Usable capacity range
5–96 kWh
Published output
5–29.999 kW rated grid AC, battery-dependent
Architecture
Integrated
Phase support
Three-phase
Backup
Whole-home capable
Warranty
10-year limited inverter and G20 battery warranties, subject to terms. Confirm G21 coverage for the quoted unit.
Cell chemistry
LFP
CEC status checked
The CEC lists six Lynx D G2 modules through 31 December 2027 and the ETA inverters through 16 February 2029.
Standout specification
The finder models one to twelve like-size 5 or 8 kWh modules. GoodWe limits each column to six modules.
Show 15 model variants
These model names sit inside the family above. Capacity, phase and output still need to match the installed configuration.
GW5K-ETA-G20
GW6K-ETA-G20
GW8K-ETA-G20
GW9.999K-ETA-G20
GW12K-ETA-G20
GW15K-ETA-G20
GW20K-ETA-G20
GW25K-ETA-G20
GW29.999K-ETA-G20
GW5.1-BAT-D-G20
GW5.1-BAT-D-G21
GW8.3-BAT-D-G20
GW8.3-BAT-D-G21
GW6.0-BAT-D-G20
GW9.0-BAT-D-G20
02
Our opinion
The buying view.
EDITORIAL OPINION - BASED ON THE CITED RESEARCH
“Start with the inverter required for your supply, then compare the usable storage and battery output for that exact stack.”
Best suited to
Three-phase homes that need storage with a matched hybrid inverter
What stands out
The finder models one to twelve like-size 5 or 8 kWh modules. GoodWe limits each column to six modules.
03
Cons and watch-outs
What to check before buying.
These are configuration trade-offs and questions to verify, not claims that the product is defective.
Quote Checker can also assess like-size 6 or 9 kWh models. Mixed stacks and parallel columns require an installer’s module schedule.
Grid AC output, continuous backup and battery output are separate limits. Ask for the backed-up circuits and sustained output per phase in the quote.
Ask for these points to be answered against the exact model numbers and installed configuration in your quote.
04
Evidence trail
Check the sources.
Specifications can change by model revision, region and paired hardware. CEC approval is not proof of current availability or suitability. Confirm the model and final design with the manufacturer and an accredited Australian installer.