We rank useful charging speed, solar fit, load management and budget.
Your charging plan
3.6 kW useful target.
Your car is limited to about 11 kW AC and the home supply to about 7.4 kW. Replacing 45 km of daily driving needs roughly 8.9 kWh.
1.2 hat useful maximum3.0 kWfor the cheap window1-phasehome supply
What to specify
3.6 kW or greater hardware, commissioned no higher than the car and supply allow.
Solar-aware charging with correctly installed CT or meter hardware.
Dynamic load management so the charger backs off before the main supply is overloaded.
No need to pay for multi-charger load sharing unless a second EV is realistic.
Tariff reality check
If free or cheapest electricity only lasts 3 hours, a slow charger may miss the window. But the answer is capped by the car: 11 kW AC is the approximate vehicle ceiling entered. Faster hardware can future-proof another EV, but it cannot make this one accept more.
Solar charging is not magic either. Clouds, household loads, battery behaviour and CT placement all change what surplus is available.
Equipment budget before installation$1,600
$700Estimated installation: $1,500$3,000
Top three matches
Best fit for these answers.
Equipment price and installation are shown separately. Quotes can also include switchboard, trenching, three-phase and network-approval work.
01
myenergiEV charger brandmyenergi
zappi
Offers a configuration that can meet the useful 3.6 kW target. Can follow solar surplus without requiring a matching inverter brand.
Hardware
$1,545
Installed plan
$3,045
Daily refill
about 1.2 hours
Power
7.4 / 22 kW
Solar control
CT-based ECO and ECO+ surplus charging, independent of inverter brand
Lead
Tethered Type 2 or socketed models
Watch-out: Your car accepts about 11 kW AC, so the charger's higher rating will not make this car charge faster.
Planning guide only. Dedicated home chargers must be installed by a licensed electrician. The electrician must verify switchboard capacity, earthing, protection, cable route, phase supply, network rules and the exact vehicle and charger manuals.
Share this exact shortlistThe link reopens these answers and recommendations.
Installation basics
What changes the quote?
Open guide +
01
Switchboard and supply
The electrician must verify the main switch, available capacity, protection, earthing and whether the property actually has one or three phases.
02
Cable route
Distance, wall access, trenching, fire separation, outdoor mounting and parking location often change the price more than the wallbox.
03
Energy monitoring
Solar diversion and dynamic load management need correctly placed meters or CT clamps. Matching logos alone do not prove integration.
04
Strata approval
Apartment installations may involve owners-corporation approval, common-property cabling, billing and site-wide load management.
Primary guidance
Home chargers are typically 7–22 kW and require a licensed electrician.